I’m a bit confused.When you are traveling to Auburnfrom Poverty Bar after crossing
the river, the next stop is Lower Quarry, then you travel along the Quarry
Rd to Hwy 49. I don’t see how the “River
Crossing up to the Hwy” and another 2 miles fit in there.
The Tevis Trail Map shows Poverty Bar river
crossing to the Quarry as 5 miles, then only another 2 miles to No Hands
Bridge, which is on the other side of Hwy 49.
Kathy
I have never ridden the trail you just rode (pulled at Francisco's) but
Tom Noll made a GPS track of Tevis 2006 and I have some distances for you.
Hwy49 to Lower Quarry = 1.3mi. Lower Quarry to Poverty Bar (River Crossing) =
4.8mi. River Crossing up to the Hwy = 2.0mi. If that is what you rode then the
posted mileage is correct...8.1mi.